February 22, 2007 |
|
The Lofts at |
|
Framing is underway on the fourth floor of the Bag Building. You can see the openings in the floor for the future elevators (left) and unit 433 on the right. Click on “Continue” to view more.
February 22, 2007 |
|
The Lofts at |
|
Framing is underway on the fourth floor of the Bag Building. You can see the openings in the floor for the future elevators (left) and unit 433 on the right. Click on “Continue” to view more.